WASTEWATER FEASIBILITY STUDY
to KIB home page
This Page provides access links to the KIB Feasibility Study Documents.
Click on the links below to download documents
Feasibility Study Report (Part a)
Feasibility Study Report (Part b)
Feasibility Study Report (Part c)
Appendix C - Geotechnical Report
Appendix D - Analaysis Spreadsheets
Appendix E (portion) - Wastewater Quality Survey
Archaeology Drawing
Drawing Index
Sample Drawing "C6"
Summit Environmental Preliminary EIA Report
Note: This supersedes Appendix B in the feasibility Report
Summit Environmental Ph I & II ESA Report- trunk mains and plant site
Summit Environmental FINAL Ph I & II ESA Report - additional area plant site only